Contact us

Tel:
+91-22-4157 2222

Fax +91-22-4157 2233

E-mail: sales@rajengineering.com

 

FLOOR SPACE

AREA UNIT – I UNIT – II
Overall Working area 2500 sq. meters. 10000 sq. meters
Overall covered area 2000 sq. meters. 5000 sq. meters
Overall open area 500 sq. meters. 5000 sq. meters

WE HAVE THE FACILITY FOR FORMING
DISHED ENDS (2:1 ELLIPSOIDAL, TORISPHERICAL, HEMISPHERICAL)
CONES (ECCENTRIC, CONCENTRIC, TORICONICAL)

EXPANSION BELLOW (THICK WALLED)


PRESSING FACILITY
HYDRAULIC PRESS

LOCATION

750 TONNES x 5.3 MTRS. SPAN,
PRESSING CAPACITY UPTO 75 mm

UNIT-I

250 TONNES x 4.3 MTRS. SPAN,
PRESSING CAPACITY UPTO 28 mm

UNIT-I

500 TONNES x 6.0 MTRS. SPAN,
PRESSING CAPACITY UPTO 50 mm

UNIT-II


PLATE ROLLING FACILITY

PLATE BENDING MACHINE

LOCATION

3000mm WIDE x 50mm THICK PLATE

UNIT-I

2500mm WIDE x 28mm THICK PLATE

UNIT-I

2500mm WIDE x 36mm THICK PLATE

UNIT-II


DRILLING FACILITY

HMT MAKE RADIAL DRILL MACHINE RM-63 UNIT-I
CSEPEL MAKE RADIAL DRILL MACHINE

UNIT-II


WELDING MACHINES & ACCESSORIES

SUBMERGED ARC WELDING MACHINE

LOCATION

5.0 MTRS DIA. X 6.0 MTRS. LONG (LINCOLN MAKE) 1 NOS. AT UNIT – I
7.0 MTRS DIA. X 6.0 MTRS. LONG (MEMCO MAKE) 1 NOS. AT UNIT – I
7.0 MTRS DIA. X 6.0 MTRS. LONG (MEMCO MAKE)

1 NOS. AT UNIT – II


WELDING RECTIFIERS

LOCATION

600 AMPS. 3 NOS EACH AT UNIT-I & UNIT-II
400 AMPS. 14 NOS. AT UNIT-I & 10 NOS. AT UNIT-II

TIG HIGH FREQUENCY UNITS

LOCATION

400 AMPS 4 NOS. AT UNIT-I & 2 NOS. AT UNIT-II

CUTTING FACILITY

AIR PLASMA CUTTING FACILITY LOCATION
SUITABLE TO SS MATERIAL UPTO 75mm THK. 1 NO. AT UNIT-I

POSITIONERS

POWER POSITIONERS WITH IDLERS LOCATION
60M. TONNES CAPACITY 1 SET AT UNIT-I
40M. TONNES CAPACITY 1 SET AT UNIT-I
60M. TONNES CAPACITY 2 SETS AT UNIT-II

RUBBERISED POSITIONERS WITH IDLERS LOCATION
80M. TONNES CAPACITY 4 PAIRS AT UNIT-I
40M. TONNES CAPACITY 5 PAIRS AT UNIT-I
50M. TONNES CAPACITY 4 PAIRS AT UNIT-II
30M. TONNES CAPACITY 5 PAIRS AT UNIT-II

STEEL POSITIONERS WITH IDLERS LOCATION
100M. TONNES CAPACITY 2 PAIRS AT UNIT-I
40M. TONNES CAPACITY 7 PAIRS AT UNIT-I
20M. TONNES CAPACITY 3 PAIRS AT UNIT-I
10M. TONNES CAPACITY 3 PAIRS AT UNIT-I

LIFTING FACILITIES

CRANES AT UNIT-I CAPACITY

QUANTITY

FABRICATION BAY NO. 1 15 TONNES 2 NOS.
FABRICATION BAY NO. 2 50 + 10 TONNES 1 NO.
FABRICATION BAY NO. 2 15 TONNES 1 NO.
FABRICATION BAY NO. 3 25 TONNES 1 NO.

LIFTING FACILITIES

CRANES AT UNIT-II CAPACITY

QUANTITY

FABRICATION BAY NO. 1 30 TONNES 2 NOS.
FABRICATION BAY NO. 2 30 TONNES 2 NOS.
MOBILE HYDRA 14 TONNES 1 NO.

HEAT TREATMENT FACILITY

IN-HOUSE MODULAR FURNACE
SIZE LOCATION
5M(W) X 5M(H) X 13M(L) UNIT-II
5M(W) X 2M(H) X 5M(L) UNIT-II

Product Gallery
Raj Engineering Co. All Rights Reserved. Developed and Managed by www.mesotek.com